We are publishing sketches of the tunnels along the narrow-gauge railway route Bileća – Titograd from 1955, as a rare document from our archive.
During the review of the archival material, we noted the following data: The total number of tunnels is 8, all tunnels are 4.8 meters high, with the longest being tunnel no. 8 (Nikšić – /Stuba/ – Stubica) at 235.14 meters, and the shortest is tunnel no. 5, which is 12.7 meters long between Trubjela and Kusida. The greatest incline is on the Nikšić – Stubica route, at 16 per mille.
On the construction of the track, history:
The route of the narrow gauge railway Bileća – Titograd was gradually put into operation as follows: Bileća – Nikšić on July 12, 1938, and Nikšić – Titograd on July 12, 1948. The decommissioning of this route took place in two stages: Bileća – Nikšić on May 30, 1976, and Nikšić – Titograd on November 27, 1965, when the standard gauge track was built and put into operation.
We note that the archival material on this page is the property of the website vremeplov.ba and may not be published or reused without explicit permission.